Skip over navigation

Image Gallery

People and Events

  • On November 2, 2007, Gov. Riley and Ekkehard D. Schulz, Chairman of the Executive Board of ThyssenKrupp AG, Karl-Ulrich Koehler, Chairman of the Executive Board of ThyssenKrupp Steel , and Juergen H. Fechter, Chairman of the Executive Board of ThyssenKrupp Stainless break ground on the site of ThyssenKrupp’s new $3.7 billion carbon and stainless steel processing facility in Calvert, Alabama. (11/02/07) On November 2, 2007, Gov. Riley and Ekkehard D. Schulz, Chairman of the Executive Board of ThyssenKrupp AG, break ground on the site of ThyssenKrupp’s new $3.7 billion carbon and stainless steel processing facilities in Calvert, Alabama. (11/02/07)
  • Ekkehard D. Schulz, Chairman of the Executive Board of ThyssenKrupp AG, Gov. Riley and Karl-Ulrich Koehler, Chairman of the Executive Board of ThyssenKrupp Steel attend the groundbreaking ceremony for ThyssenKrupp’s new $3.7 billion carbon and stainless steel processing facility in Calvert, Alabama. (11/02/07) Ekkehard D. Schulz, Chairman of the Executive Board of ThyssenKrupp AG and Gov. Riley attend the groundbreaking ceremony for ThyssenKrupp’s new $3.7 billion carbon and stainless steel processing facility in Calvert, Alabama. (11/02/07)
  • Mobile County Commissioners Mike Dean and Merceria Ludgood, City of Mobile Mayor Sam Jones, U.S. Senators Richard Shelby and Jeff Sessions, Congressman Jo Bonner, Chairman of the Executive Board of ThyssenKrupp AG Dr. Ekkehard D. Schulz, Governor Bob Riley, Chairman of the Executive Board of ThyssenKrupp Steel Dr. Karl-Ulrich Koehler, Chairman of the Executive Board of ThyssenKrupp Stainless Juergen H. Fechter, Town of Mt. Vernon Mayor Cleon Bolden, Alabama Power CEO Charles McCrary, Neal Wade, Director, Alabama Development Office and Mobile County Commissioner Steve Nodine together break ground on the site of ThyssenKrupp’s new $3.7 billion carbon and stainless steel processing facility in Calvert, Alabama. (11/02/07) Mobile County Commissioners Mike Dean and Merceria Ludgood, City of Mobile Mayor Sam Jones, U.S. Senators Richard Shelby and Jeff Sessions, Congressman Jo Bonner, Chairman of the Executive Board of ThyssenKrupp AG Dr. Ekkehard D. Schulz, Governor Bob Riley, Chairman of the Executive Board of ThyssenKrupp Steel Dr. Karl-Ulrich Koehler, Chairman of the Executive Board of ThyssenKrupp Stainless Juergen H. Fechter, Town of Mt. Vernon Mayor Cleon Bolden, Alabama Power CEO Charles McCrary, Neal Wade, Director, Alabama Development Office and Mobile County Commissioner Steve Nodine together break ground on the site of ThyssenKrupp’s new $3.7 billion carbon and stainless steel processing facility in Calvert, Alabama. (11/02/07)
  • Alongside Uli Albrecht-Frueh, CEO of ThyssenKrupp Stainless, Mobile Mayor Sam Jones addresses the crowd at the Mobile, Alabama, community open house. (07/30/07) Alongside Uli Albrecht-Frueh, CEO of ThyssenKrupp Stainless, Mobile Mayor Sam Jones addresses the crowd at the Mobile, Alabama, community open house. (07/30/07)
  • More than 450 residents of Mt. Vernon and Calvert attended the first ThyssenKrupp community open house to discuss details of the Calvert, Alabama, facility. (07/23/07) More than 450 residents of Mt. Vernon and Calvert attended the first ThyssenKrupp community open house to discuss details of the Calvert, Alabama, facility. (07/23/07)
  • ThyssenKrupp and state and local officials sign the formal Memorandum of Understanding to finalize the selection of Calvert, Alabama, as the new site. (05/14/07) ThyssenKrupp and state and local officials sign the formal Memorandum of Understanding to finalize the selection of Calvert, Alabama, as the new site. (05/14/07)
  • On May 11, 2007, Gov. Riley and Peter Urban, Vice Chairman of the Executive Board of ThyssenKrupp Steel, Dr. Michael Rademacher, Vice President of the Executive Board of ThyssenKrupp Stainless announced Alabama as the home for its new facility. (05/11/07) On May 11, 2007, Gov. Riley and Peter Urban, Vice Chairman of the Executive Board of ThyssenKrupp Steel and Dr. Michael Rademacher, Vice President of the Executive Board of ThyssenKrupp Stainless announced Alabama as the home for its new facility. (05/11/07)

New Plant Visuals

  • Proposed Facility Design Facility Design
  • Proposed Facility Layout Proposed Facility Layout

ThyssenKrupp Plant Visuals

ThyssenKrupp designs and builds its new production facilities throughout the world to be compatible with the natural landscape.

  • ThyssenKrupp Stainless Nirosta – Annealing and Pickling Line ThyssenKrupp Stainless Nirosta – Annealing and Pickling Line
  • ThyssenKrupp in Tagal, China ThyssenKrupp in Tagal, China
  • ThyssenKrupp Power House in Hamborn, Germany ThyssenKrupp Power House in Hamborn, Germany
  • ThyssenKrupp Surface Treatment Center in Dortmund, Germany ThyssenKrupp Surface Treatment Center in Dortmund, Germany
  • ThyssenKrupp Coking Plant in Schwelgern, Germany ThyssenKrupp Coking Plant in Schwelgern, Germany
  • ThyssenKrupp Steel Plant in Duisburg, Germany ThyssenKrupp Steel Plant in Duisburg, Germany

Steel Production

ThyssenKrupp employs advanced technology equipment in the processing of various grades of carbon steel.

  • Modern Coil Processing Modern Coil Processing
  • Customized Blanks Customized Blanks
  • Coated Steel Production Coated Steel Production
  • High-tech Processing Facility High-tech Processing Facility
  • Advanced Technology Control Center Advanced Technology Control Center

Representative Steel Products

ThyssenKrupp carbon steel products have a multitude of applications, including those for everyday use as well as industrial needs.

  • Cans for Consumer Use Cans for Consumer Use
  • Vehicle Structure Vehicle Structure
  • Complex Automotive Door Panel Complex Automotive Door Panel
  • Wind Turbine Blades Wind Turbine Blades
  • Specialized Tubing for Heat Exchangers Specialized Tubing for Heat Exchangers
  • Innovative Building Facade System Innovative Building Facade System
  • Hydroformed Tubes Hydroformed Tubes

Stainless Steel Production

ThyssenKrupp stainless steel production and processing features the most modern equipment available in the industry today.

  • Stainless Coil Processing Stainless Coil Processing
  • Strict Tolerance to Customer Specifications Strict Tolerance to Customer Specifications
  • Stainless Processing Stainless Processing
  • Hot Dip Coating Line Control Pulpit Hot Dip Coating Line Control Pulpit

Representative Stainless Steel Products

ThyssenKrupp stainless steel is used for a variety of products that demand special characteristics such as durability, sterility and visual appeal.

  • Distinctive Elevator Interiors Distinctive Elevator Interiors
  • Sterile Medical Instruments Sterile Medical Instruments
  • Precision Watch Movements Precision Watch Movements
  • Durable Washing Machine Drums Durable Washing Machine Drums
  • Specialized Building Architecture Specialized Building Architecture
  • Stainless Steel Suspended Ceiling Stainless Steel Suspended Ceiling